82 New EV Charging Ports Coming To Part Of Maryland - CleanTechnica

Source: cleantechnica
Author: @cleantechnica
Published: 11/20/2025
To read the full content, please visit the original article.
Read original articleAmeresco, in collaboration with The Resilience Authority of Annapolis and Anne Arundel County, Maryland, is expanding electric vehicle (EV) charging infrastructure by installing 82 new charging ports across nine county-owned facilities. These ports will serve predominantly light-duty fleet vehicles, with some medium-duty vehicles at select locations, supporting various government departments such as Health and Inspections & Permits. The charging stations will include a mix of Level 2 and DC fast chargers, with one facility receiving make-ready infrastructure for future charger installation.
The project incorporates an advanced Charging and Energy Management system called ChargePilot, developed by The Mobility House, which enables adaptive load management by shifting charging to off-peak periods and reducing peak electrical demand. This data-driven approach, based on fleet assessments and charging simulations, allows the county to optimize electrical capacity needs, resulting in a reduction of 2.5 MW in required capacity and approximately $350,000 in annual utility savings. The county aims to transition its entire non-emergency
Tags
energyelectric-vehiclesEV-charging-infrastructurefleet-electrificationclean-energyenergy-management-systemsustainable-transportation